Skip to main content

About your Search

20130128
20130128
STATION
SFGTV 2
LANGUAGE
Search Results 0 to 1 of about 2
? >> supervisor campos: if we can ask ms. campbell? i just wanted to give my colleagues the opportunity to say anything. >> good afternoon chair chur and members of the committee. supervisor campos did actually go over the scope that we have introduced in the motion. it's a very broad scope. at the scope that would be like any initiative of any audit. we conduct a risk assessment, where we would carefully define the scope and narrow it to what we consider the most critical areas. a couple of points about this audit. this is a hud-funded agency, not funded by the city. we have met with the government relations officer from the housing authority and discuss our working relationship. he did provide us with a copy of the information request provided by hud. we talked about what the hud scope would be so we would be able to work cooperatively and make sure we are making the best use of resources in terms of conducting the audit. we have already begun that discussion, although abortion is not the best. >> supervisor campos: ms. campbell forgot to brought this, and glad that you brought it up. housi
and that is that especially since mike campbell left, your staff doesn't understand what is in front of them for local power, they do a lot of good work on a lot of different things when it comes to local distributed generation of local clean energy, they are not getting this. and we have really got do something to pick up on what jessica was talking about and we need to hire a director for the staff that is deeply knowledgeable about the local distributed generation and how to implement it through this program otherwise we are going to lose this program. and i want to get back to the key problem is that for many many years through many ordinance and is resolutions both the board of supervisors and yourselves have directed your staff to work on the local power model and bring it forward. these resolution and is ordinances did not direct power enterprise staff to battle with the contractor, who which, is far more enter the than they are on these issues and resist what they are proposing at every turn i'm sorry to be so critical, but this is very serious as you were saying commissioner mr. president, the f
Search Results 0 to 1 of about 2